Sofia VG

On the 30th of April 2026, biofuel powered vessel Sofia VG(NB 832) was delivered to her owners Meriaura. The yard now continues with the building process of sistervessel NB 833. The ships are designed to achieve the lowest possible emission levels. Like the EcoCoaster vessels Eeva VG and Mirva VG delivered in 2016 by Royal Bodewes, the Ecotraders can be operated with biofuel. Emission reductions are achieved not only through the use of renewable fuel but also through hull optimization and advanced engine technology provided by Wärtsila. Due to these technical improvements the ship’s fuel economy is remarkably better compared to older vessels.

Particular details

Build number

832

Year built

2026

Length over all

104,93 m

Length b.p.p.

102,98 m

Breadth mld.

15 m

Depth mld.

9,50 m

Deadweight

6735 ton

Tonnage

4144 GT

Speed

11,8 knots

Hold capacity

310.000 cbft

Hybrid

Yes

Ice Class

Yes

Geared

No

Contact us

Give us a call or fill in the form below and we will contact you within 24 hours on working days.

Martijn Beunk

Business Development

More about the Sofia VG